Grand Isle Consolidated Water District, (GICWD) Grand Isle, VT 
Preliminary Engineering, Final Design and Construction Phases, 
Subsurface Planning Study and General Consulting 
Mr. Richard Dreves, Chair:  (802) 372-4534 
P.O. Box 9, Grand Isle, VT  05458 

GME has been working with the water users of Grand Isle since 1991. The original Preliminary Engineering Report was conducted for the Grand Isle Fire District No. 3, which has since merged with the G.I.F.D. #1 and G.I.F.D. #2 to form the GICWD.  The current system, built in three phases, now consists of a Lake Champlain Intake, a 356,000 gpd Kinetico™ Filtration System (selected for use following a successful Pilot Study by GME), over 100,000 feet of distribution lines, a 300,000 gallon storage tank, and water meters for each user.  A second, 132,900 gallon storage tank was constructed in 2003.  A project for the Bell Hill Tank Bypass and Emergency Connection to G.I.F.D. #4 was constructed in 2007.  GME was contracted in 2009 to complete a comprehensive subsurface data collection, integration and mapping study.  The information collected during the mapping study is currently being used to create a WaterCAD® model of the system.  Currently providing Final Design Phase engineering for Disinfection By-Products & Backwash Improvements.


Town of Bristol, Vermont       
Water & Sewer Collection & Treatment Subsurface Planning Study, 
Engineering for Water/Wastewater/Stormwater Improvements, 
Annual Wastewater System Inspections & General Consulting 
Mr. Bill Bryant, Town Administrator:  (802) 453-2410   
Holley Hall, P.O. Box 249, Bristol, VT 05443   

GME has been working with the Town of Bristol since 1992.  In 2005, we assisted with a waterline replacement project, replacing 2,817 linear feet of existing 4-inch waterline with a new 8-inch ductile iron water main on Pine Street, North Street and Plank Road.  New service connections and water shut-offs for all users were supplied.  In 2009, we assisted the Town with utilizing ARRA funding for the removal and replacement of approximately 3,200 linear feet of existing storm drain and appurtenances, a partial re-grading of North Street, implementation of curb and gutter, and approximately 2,000 linear feet of water main replacement.  Construction Contract Documents, Bid Phase Services, and Resident Inspection services have all been provided.  Most recently, we completed an evaluation of subsurface utilities for the former Village of Bristol.  We created maps of the stormwater drains and water and sewer system in the Town, necessary as a planning tool for determining the adequacy of culverts being replaced with money allocated from the State of Vermont.  The project included data collection, engineering evaluation and a final report for municipal officials, providing a prioritized matrix of segments of subsurface utilities to be repaired or replaced with opinions of probable construction costs and potential sources of funding identified.
 


Town of Richmond, Vermont Infrastructure Rehabilitation Project 
Preliminary Engineering, Final Design and Construction Phases, 
Subsurface Planning Study and General Consulting 
Mr. Geoffrey Urbanik, Administrator, (802) 434-5170 
P.O. Box 285, Richmond, VT  05477 

GME has been assisting the Town of Richmond with engineering services since 1995.  In 2005, GME successfully completed research and evaluation of all subsurface infrastructures to address necessary upgrade and/or replacement.  In 2009, we assisted the Town with utilizing ARRA funding to begin addressing improvements detailed in that Report:  a stormwater upgrade on Millet Street and Tilden Avenue, and a Sewer Lining and Renovations project on Depot Street to improve the condition of the existing sanitary system.



Town of Middlebury, Vermont  
Buttolph Drive, Stewart Lane and Rolling Acres Infrastructure/
Water System Improvements, Design and Construction Phases
Mr. Dan Werner, Director of Operations:  (802) 388-4045  

GME has been assisting the Town of Middlebury with several projects since 2006, providing engineering, design and construction phase services for infrastructure improvements.  The Buttolph Drive and Stewart Lane projects include installation of water main and appurtenances, rehabilitation of sewer manholes, cleaning and television inspection of sewer main, and installation of water mains, services and storm sewer and sump pump service connections.  The Rolling Acres project consists of upgrading an existing 2-inch waterline to 8-inch, connecting current users via saddles, corporation stops and connection to the existing water services.




Town of West Pawlet, Vermont 
Pawlet Wastewater Treatment Facility Refurbishment 
Mr. Mike Beecher, Selectboard (800) 451-0938 
P.O. Box 128, Pawlet, VT  05761 

GME has been working with the Town of Pawlet since 1999, providing consulting engineering services for landfill monitoring and general consulting.  In 2008, we assisted the Town with addressing compliance issues with the existing RBC wastewater treatment facility, and entered into Planning and Preliminary Engineering Phase for an upgrade of the facility.  We worked successfully with Town officials to secure planning funds through the State Clean Water Revolving Loan Fund, and are currently amending the Preliminary Engineering Report prior to proceeding to the Final Design Phase.  An Environmental Assessment Report was completed in January. 